The cost of this installation includes the following:
- Up to 3metres of refrigerant piping, drain pipe and cable
- Outdoor mounting bracket (if required)
- Installation to a maximum height of 3metres above ground level
- Drilling of one hole for piping
- Holes will be filled but not painted
Installation back to back - copper
The installer will quote for all costs in addition to the 3metre back-to-back installation which will include but are not limited to the following:
- Any required piping and cabling in addition to the piping and cabling referred to above, or electrical connection to the main switchboard
- Travelling expenses in the event of the installation being out of a 30km radius from where the unit was bought
- Any other extras, including but not limited to:
- external isolators and additional electrical work required
- any additional refrigerant piping, insulation, drainpipe, and cable
- trunking to cover piping
- Pump
The costs of isolators are not included in the installation fee. Isolator switches are a regulation requirement and are not included in the cost of the installation. A qualified electrician must install an isolator at the consumer’s own cost. He must install the isolator not more than 2metres from the condenser and within view of the condenser. The cost of this is in addition to the installation cost of the unit and must be paid directly to the electrician. Indoor and outdoor units must always be earthed.